Yellowstone Business Partnership Advancing Sustainable Enterprise

GY Framework Credit Intents and Requirements

Introduction to PSI Credits
PSI Prerequisite 1: Code Compliance
PSI Prerequisite 2:  Water Metering
PSI Credit 1: Shared Services: Energy/Water Efficiencies
PSI Credit 2: Renewable Energy: Expanded Use
PSI Credit 3: Carbon Emission Reduction
PSI Credit 4: Electric Load/Demand Efficiency
PSI Credit 5: Water Use Efficiency
PSI Credit 6: Water Quality
PSI Credit 7: Snow Plan
PSI Credit 8: Utility Construction and Resource Management
Click Here for a pdf of all PSI Intents and Requirements
Main Table of Contents







GY Framework Intents and Requirements PSI Prereq 2
Log into YBP Member Section Search 
= Membership Required

PSI PREREQUISITE 2:  WATER METERING


REQUIRED

    INTENT

To conserve scarce water resources over the long-term and raise owner and consumer awareness of this need.

    REQUIREMENTS

All projects will include metered water use in the final development to the extent possible.  State and seasonal projects can apply for an exemption under special circumstances.

For public water systems, the system shall individually meter users, and the metering shall be strictly enforced.  If service to the development or structure is not provided via public water system, the individual users shall individually meter use (i.e., irrigation users, individual wells, etc.).  Where technologies allow, the intent is to raise owner and consumer awareness about their water use and potential for waste with the ultimate goal being to promote conservation and wise use of water resources.  

If water has to be hauled to the site via water truck or portable tank, addition of a meter to the source will not qualify for compliance with this prerequisite except in the case where the structure is owned and maintained by a government agency for the purpose of a visitor center or other public facility that ultimately minimizes human waste in areas where high foot traffic occurs.  If the proposed structure is a private development with the need to haul water, this prerequisite will not be met as it is generally believed that this type of development should not occur in areas where water resources are not readily available to sustain the development.
PSI Table of Contents

Yellowstone Business Partnership
PO Box 7337 Bozeman, MT 59771-7337 * 406-522-7809 * 888-583-8283 * info@yellowstonebusiness.org
Copyright 2010 Yellowstone Business Partnership. All Rights Reserved