GY Framework Credit Intents and Requirements

Introduction to PSI Credits
PSI Prerequisite 1: Code Compliance
PSI Prerequisite 2:  Water Metering
PSI Credit 1: Shared Services: Energy/Water Efficiencies
PSI Credit 2: Renewable Energy: Expanded Use
PSI Credit 3: Carbon Emission Reduction
PSI Credit 4: Electric Load/Demand Efficiency
PSI Credit 5: Water Use Efficiency
PSI Credit 6: Water Quality
PSI Credit 7: Snow Plan
PSI Credit 8: Utility Construction and Resource Management
Click Here for a pdf of all PSI Intents and Requirements
Main Table of Contents







GY Framework Intents and Requirements PSI Credit8
Log into YBP Member Section Search 
= Membership Required

PSI CREDIT 8:  UTILITY CONSTRUCTION AND RESOURCE MANAGEMENT


1 POINT

    INTENT

To reduce environmental impacts and social costs, and provide economic alternatives to traditional open cut methods of utility installation, rehabilitation, or replacement.

    REQUIREMENTS

A municipality desiring to receive points in this section shall demonstrate measures to:
•    Monitor and reduce water system loss due to transmission system leaks
•    Reduce wastewater system infiltration and inflow (I&I)
•    Have established and routinely update a “Capital Improvements Plan” (CIP) that addresses municipal utilities
•    Provide a written commitment to the appropriate use and implementation of Trenchless technology for the rehabilitation, replacement, or installation of water, wastewater, or stormwater conveyance utilities

Any areas having to improve the condition or capacity of water, wastewater, or storm water conveyance utilities shall investigate the applicability of Trenchless technology to rehabilitate, replace, and/or install new utilities. Determine through the submittal process defined below if Trenchless technology is appropriate.

•    Reduce by 80% Asphalt and/or Concrete pavement removal associated with water, wastewater, or storm water conveyance utility rehabilitation, replacement, or installation. (1 point)

    OR

•    Reduce by 80% new Asphalt and/or Concrete pavement replacement associated with water, wastewater, or storm water conveyance utility rehabilitation, replacement, or installation. (1 point)

    OR

•    Where water, wastewater, or stormwater conveyance utilities require rehabilitation, replacement, or installation, and/or require additional capacity, utilize the appropriate Trenchless technology method for the conditions and intended result (1 point).

Avoid use of Poly Vinyl Chloride (PVC) in any new utility material where possible.
PSI Table of Contents

Yellowstone Business Partnership
PO Box 7337 Bozeman, MT 59771-7337 * 406-522-7809 * 888-583-8283 * info@yellowstonebusiness.org
Copyright 2012 Yellowstone Business Partnership. All Rights Reserved