Yellowstone Business Partnership Advancing Sustainable Enterprise

GY Framework Credit Intents and Requirements

Introduction to PSI Credits
PSI Prerequisite 1: Code Compliance
PSI Prerequisite 2:  Water Metering
PSI Credit 1: Shared Services: Energy/Water Efficiencies
PSI Credit 2: Renewable Energy: Expanded Use
PSI Credit 3: Carbon Emission Reduction
PSI Credit 4: Electric Load/Demand Efficiency
PSI Credit 5: Water Use Efficiency
PSI Credit 6: Water Quality
PSI Credit 7: Snow Plan
PSI Credit 8: Utility Construction and Resource Management
Click Here for a pdf of all PSI Intents and Requirements
Main Table of Contents







GY Framework Intents and Requirements PSI Credit7
Log into YBP Member Section Search 
= Membership Required

PSI CREDIT 7:  SNOW PLAN


1 POINT

    INTENT

To reduce the impact of snow and meltwater on pedestrian travel and safety, on nearby water bodies, and on stormwater systems.

    REQUIREMENTS

Establish a comprehensive snow management plan including snow removal from streets, sidewalks, and bicycle lanes, snow storage, and meltwater management to prevent contamination of ground or surface water or flooding. Avoid use of chemicals or salts as melting agents.

    AND

Ensure removal of snow and ice from sidewalks and similar pedestrian areas in a timely manner to facilitate walking and prevent injury. Add language to commercial leases and/or CC&R’s which require timely and appropriate removal methods.

    AND

Properly configure and maintain pedestrian crossings to avoid blocked storm and meltwater inlets and resulting water and ice barriers to pedestrian use.
PSI Table of Contents

Yellowstone Business Partnership
PO Box 7337 Bozeman, MT 59771-7337 * 406-522-7809 * 888-583-8283 * info@yellowstonebusiness.org
Copyright 2012 Yellowstone Business Partnership. All Rights Reserved