GY Framework Credit Intents and Requirements

Introduction to PSI Credits
PSI Prerequisite 1: Code Compliance
PSI Prerequisite 2:  Water Metering
PSI Credit 1: Shared Services: Energy/Water Efficiencies
PSI Credit 2: Renewable Energy: Expanded Use
PSI Credit 3: Carbon Emission Reduction
PSI Credit 4: Electric Load/Demand Efficiency
PSI Credit 5: Water Use Efficiency
PSI Credit 6: Water Quality
PSI Credit 7: Snow Plan
PSI Credit 8: Utility Construction and Resource Management
Click Here for a pdf of all PSI Intents and Requirements
Main Table of Contents







GY Framework Intents and Requirements PSI Credit4
Log into YBP Member Section Search 
= Membership Required

PSI Credit 4:  Electric Load/Demand Efficiency

1 - 2 Points

    INTENT

To reduce the need for power peaking capacity and to minimize the need for upgrades to transmission and distribution electrical systems.

    REQUIREMENTS

Install demand controls to selectively shed electric loads during peak periods.

          For controllability of 10% or more of the total electrical peak demand for the development
(1 point)

          For controllability of 20% or more of the load for the development (2 points)

For Local Governments: Incorporated Towns, Cities, and Counties:

Implement a community-wide program of peak load reduction.


PSI Table of Contents

Yellowstone Business Partnership
PO Box 7337 Bozeman, MT 59771-7337 * 406-522-7809 * 888-583-8283 * info@yellowstonebusiness.org
Copyright 2010 Yellowstone Business Partnership. All Rights Reserved