PSI Credit 4: Electric Load/Demand
Efficiency
1
- 2 Points
To reduce the need for power peaking
capacity and to
minimize the need for upgrades to transmission and distribution electrical
systems.
Install demand controls to
selectively shed electric loads
during peak periods.
• For
controllability of 10% or more of the total
electrical peak demand for the development
(1 point)
• For
controllability of 20% or more of the load
for the development (2 points)
For
Local Governments: Incorporated Towns, Cities, and Counties:
Implement
a community-wide program
of peak load reduction.