Yellowstone Business Partnership Advancing Sustainable Enterprise

GY Framework Credit Intents and Requirements

Introduction to BD Credits


BD Prerequisite 1:  Co-existing with Wildlife
BD Credit 1: Preservation of Aquatic Resources
BD Credit 2: Surface and Ground Water Conservation
BD Credit 3: Habitat Conservation and Connectivity
BD Credit 4: Vegetative Management
BD Credit 5: Habitat Restoration and Enhancement
BD Credit 6: Fence Siting and Materials
BD Credit 7: Domestic Animal Management
Click Here for a pdf of all BD Intents and Requirements
Main Table of Contents
GY Framework Intents and Requirements BD Credit2
Log into YBP Member Section Search 
= Membership Required

BD CREDIT 2:  SURFACE AND GROUND WATER CONSERVATION

1 -3 POINTS

    INTENT

To preserve or improve water quality and quantity at and near the developed area.

    REQUIREMENTS

Create a surface and ground water conservation plan with the assistance of hydrologists and water quality specialists that will protect water quality and quantity in streams and groundwater sources. The plan must identify ways to conserve water quantity and quality through reduced irrigation, efficient systems, alternative sources of water for irrigation, water harvesting and storage, and storm water runoff.  The plan should prevent contamination of ground water from septic systems and other pollution sources and promote connecting to or building central sewer systems if up-gradient to existing wells within 1 mile.  The plan should also provide hydrologic proof that the proposed water use will not deplete existing groundwater resources or nearby stream flows.  The plan should address application of fertilizers and pesticides and show that all federal permit requirements and Best Management Practices (BMP) have been followed for managing storm water runoff. (1 point)

    AND FOR UP TO 2 ADDITIONAL POINTS

Maintain no more than .25 acres of landscaping per property that must be irrigated by ground water sources (1 point).

    OR


Integrate rainwater harvesting mechanisms into all structures to capture rainwater for landscaping or ground water recharge. www.harvestingrainwater.com (1 point).

Innovation points will be considered for those projects that can help restore surface flows by limiting consumptive use of water on the property and by legally designating the remainder of non-consumptive water rights for instream use.
For further innovation points, projects can submit evidence that state water rights have been secured for instream purposes.
BD Table of Contents

Yellowstone Business Partnership
PO Box 7337 Bozeman, MT 59771-7337 * 406-522-7809 * 888-583-8283 * info@yellowstonebusiness.org
Copyright 2010 Yellowstone Business Partnership. All Rights Reserved